Tagged: repudiatory breach

London Arbitration 16/22

ELECTRICAL FAILURE – OFF HIRE – REPUDIATORY BREACH – EARLY TERMINATION
An electrical failure occurred on a vessel during a charter period. Both owner and charterer filed claims for the balance of the time spent fixing the issue.The charterer claimed that the vessel was off hire after the breakdown, because she could no longer perform the tasks they required. The owner claimed that the vessel was ready to perform the services that were initially instructed, and that the charterer was in breach of the charterparty.