London Arbitration 11/14

WHETHER VESSEL "IN EVERY WAY FITTED FOR THE VOYAGE" -- SUITABILITY OF VESSEL’S MOORING EQUIPMENT FOR THE LOADING INSTALLATION -- REPUDIATORY BREACH -- DETENTION AND DAMAGES -- Charterer Award The Vessel arrived at loadport without the necessary equipment to operate safely at the shipper’s loading installation. Charterer cancelled the charter after the Vessel was viewed as unfit for the voyage. Owner claimed damages for Charterer’s rejection.
To access this content, you must either Log In or Subscribe.